19 03, 2014

The Future of Test Equipment

2014-03-19T11:54:39-04:00March 19th, 2014|

The Future of Test Equipment and the Role of Proactive Network Maintenance At a recent convention, I had the opportunity to listen to Daniel Howard, CTO of the SCTE, speak about how Comcast is using, Rohde & Schwarz in conjunction with their PNM (Proactive Network Maintenance) Scout Flux system.  This highlights that although PNM is the future of troubleshooting cable plant problems proactively, high-end test equipment will still be needed.  One common thread across the industry that I like to re-iterate is that the cable plant does not

19 11, 2011
  • Rohde Schwarz

Fresh Tech from Cable-Tec Expo 2011

2020-06-09T09:59:13-04:00November 19th, 2011|

At this year's Cable-Tec Expo, Rohde & Schwarz (www.rohde-schwarz.com) introduced a 1U Cable Load Generator (CLG) capable of simulating cable TV networks with full channel loading. This baby is not just limited to North America, but can do channel plans for the World over! Here are the highlights:

Go to Top