25 10, 2013
  • 16-QAM Constellation Diagram

DOCSIS Modulation Options and Impacts – Part One

2022-01-07T11:29:37-05:00October 25th, 2013|

What’s Next for DOCSIS Modulation Options and Impacts This paper is the second in a series titled “What’s Next for DOCSIS:” (Young, 2012), and outlines the anticipated DOCSIS near, medium, and long term next generation (NG) network specifications; identifies and presents high spectral efficiency (SE) modulation options capable of enabling DOCSIS 3.1/NG network specification compliance; identifies the likely modulation technique winner(s) and why; and finally presents NG network operational, test, and troubleshooting challenges facing network installers and repair technicians. SECTION 2 INTRODUCTION – What is Modulation Anyway? Modulation

12 09, 2013

DOCSIS 3.1: Begin Preparing Now

2013-09-12T14:45:51-04:00September 12th, 2013|

DOCSIS 3.1: Begin Preparing Now Posted on September 11, 2013 by Carl Weinschenk-BTR Experts believe that DOCSIS 3.1 is few years off. The specification has not yet been finalized. After that, test and early customer premise equipment (CPE) and corresponding CMTS and CCAP line cards will be sprinkled through systems. The bottom line is that it will be a long time until DOCSIS 3.1 is an element of everyday cable operations. So preparations should start now. The industry has been down this road before. What seems like a long road, with

Go to Top