10 07, 2014

DOCSIS 3.1 SYMPOSIUM AT SCTE CABLE-TEC EXPO

2024-03-01T14:05:42-05:00July 10th, 2014|

Pre-Conference Symposium Monday, Sept. 22, in conjunction with SCTE Cable-Tec Expo 2014   FROM SCTE: "Scheduled from 9:00 AM until 4:30 PM at Denver’s Colorado Convention Center, the symposium is a joint presentation of SCTE and CableLabs. The event will feature four sessions each on wireless and DOCSIS 3.1. The current schedule of sessions comprises: 9:15 AM—Carrier Grade Wi-Fi Mark Poletti, Lead Wireless Architect, CableLabs 9:45 AM—Wi-Fi Analytics, Cloud and Radio Resource Management Scott Helms, Vice President of Technology, ZCorum 10:45 AM—Community Wi-Fi Vivek Ganti, System Engineer, CableLabs

3 07, 2014

DOCSIS 3.1 Checklist

2014-07-03T09:55:31-04:00July 3rd, 2014|

DOCSIS 3.1 July 10, 2014 • 12:00 p.m. ET; 9:00 a.m. PT While full-scale DOCSIS 3.1 implementations may not occur for another two years, cable operators are currently preparing their networks. In this free, live, Google Hangout, which is sponsored by VeEX, and hosted by CED, attendees will learn about how cable operators and vendors are gearing up for 3.1 rollouts. Topics include: • Update on status and timeline for DOCSIS 3.1 • Planning for growth capacity • Spectrum planning • The modulation options and their potential impact

20 05, 2014

ANGACOM 2014 DOCSIS 3.1 Technology Panel

2014-05-20T16:21:23-04:00May 20th, 2014|

DOCSIS 3.1: Challenges to make DOCSIS 3.1 operational in HFC Networks ANGACOM Moderator: Brady Volpe - President and CTO, The Volpe Firm 11.45 - 13.00 Technology Panel ROOM B Access Network Dimensioning in DOCSIS 3.1 Dr. L. Alberto Campos - Principal Architect Advanced Technology Group, Cable Television Laboratories Impact of DOCSIS 3.1 on HFC Network Design Dirk Langer - Head of Marketing Broadband Communication Systems, KATHREIN-Werke KG Ingress/Egress/LTE: The Imperative to improve the In-Home Interconnect Keith Mothersdale - Head of Engineering, Passives and Indoor Solutions, Teleste Corporation Challenges

1 05, 2014

DOCSIS Experts – Ask Pre-Eq and PNM questions May 2nd

2021-08-17T11:07:36-04:00May 1st, 2014|

DOCSIS Pre-Eq and PNM :: (Part 2) As a follow up to Part one (which can be viewed here) Part two we will cover how pre-equalization data can be used to identify upstream impairments through Proactive Network Maintenance (PNM) and why this is valuable to a cable operator. Join us page to ensure that you can view the event. Proactive Network Maintenance (PNM) in combination with DOCSIS pre-equalization are game changing technologies for the cable industry. PNM started as a technology research project at CableLabs and has now

22 04, 2014
  • DOCSIS PODCAST

DOCSIS Pre-Eq and PNM – Part Two

2021-08-17T11:03:31-04:00April 22nd, 2014|

The Benefits of DOCSIS Pre-Eq and PNM :: (Part 2) Presented by John Downey of Cisco and Brady Volpe of The Volpe Firm and Nimble This as a follow up to Part one (which can be viewed here) Part two we will cover how pre-equalization data can be used to identify upstream impairments through Proactive Network Maintenance (PNM) and why this is valable to a cable operator. Proactive Network Maintenance (PNM) in combination with DOCSIS pre-equalization are game changing technologies for the cable industry.  PNM started as a technology research

13 03, 2014

DOCSIS 3.1 Challenges to make DOCSIS 3.1 Operational in HFC Networks

2014-03-13T09:09:28-04:00March 13th, 2014|

DOCSIS 3.1 : Challenges to make DOCSIS 3.1 Operational in HFC Networks ANGACOM 2014 May 21, 2014 - Technology Panel 11:45am - 1:00pm - Room B Come See Brady Volpe at ANGACOM Moderator: Brady Volpe - President and CTO, The Volpe Firm Access Network Dimensioning in DOCSIS 3.1 Dr. L. Alberto Campos - Principal Architect Advanced Technology Group, Cable Television Laboratories Impact of DOCSIS 3.1 on HFC Network Design Dirk Langer - Head of Marketing Broadband Communication Systems, KATHREIN-Werke KG Ingress/Egress/LTE: The Imperative to improve the In-Home Interconnect Keith Mothersdale - Head of

26 02, 2014
  • DOCSIS 3.0

DOCSIS 3.1 Webinar Today

2020-06-09T10:02:42-04:00February 26th, 2014|

DOCSIS 3.1 Webinar "With some of the DOCSIS 3.1 specifications being published by CableLabs late last year, it's time to start planning for the operational changes at the plant level for deployments, and discuss what type of monitoring tools will be needed. In this live, 60-minute webcast, which is sponsored by VeEX, and hosted by CED, attendees will learn about some of the key operational aspects that need to be looked at ahead of 3.1 deployments. Operation DOCSIS 3.1 Date: February 26, 2014 Time: 11:00 AM ET, 10:00 AM CT, 8:00 AM PT Duration: 60 Minutes

25 02, 2014

DOCSIS 3.1 Live Webcast

2014-02-25T11:16:15-05:00February 25th, 2014|

"With some of the DOCSIS 3.1 specifications being published by CableLabs late last year, it's time to start planning for the operational changes at the plant level for deployments, and discuss what type of monitoring tools will be needed. In this live, 60-minute webcast, which is sponsored by VeEX, and hosted by CED, attendees will learn about some of the key operational aspects that need to be looked at ahead of 3.1 deployments. REMINDER: Attend this live webcast and pose your critical questions to the panel of experts during the Q&A

15 02, 2014

NCTC WEC February 17-18th

2014-02-15T16:39:03-05:00February 15th, 2014|

NCTC WEC 2014 February 17 -18th Tampa, Florida We will be attending NCTC WEC.  If you are interested in finding out more about Proactive Network Maintenance (PNM) or in discussing a technical topic with us.  Get in touch. We will also have some of our popular DOCSIS 3.0 posters with us.  We will only give them out at the show.  So tell a friend who is attending if you cannot. DOCSIS 3.0 Cable Modem Registration Poster with T3 and T4 timeouts, constellation analysis and QAM chart.  

Go to Top