25 10, 2013
  • 16-QAM Constellation Diagram

DOCSIS Modulation Options and Impacts – Part One

2022-01-07T11:29:37-05:00October 25th, 2013|

What’s Next for DOCSIS Modulation Options and Impacts This paper is the second in a series titled “What’s Next for DOCSIS:” (Young, 2012), and outlines the anticipated DOCSIS near, medium, and long term next generation (NG) network specifications; identifies and presents high spectral efficiency (SE) modulation options capable of enabling DOCSIS 3.1/NG network specification compliance; identifies the likely modulation technique winner(s) and why; and finally presents NG network operational, test, and troubleshooting challenges facing network installers and repair technicians. SECTION 2 INTRODUCTION – What is Modulation Anyway? Modulation

17 10, 2013
  • DOCSIS Pre-Equalization

DOCSIS Pre-Equalization

2020-04-04T11:42:09-04:00October 17th, 2013|

DOCSIS Pre-Equalization This paper will first provide a brief primer on DOCSIS to establish a baseline for the document. Next the paper will examine what is DOCSIS pre-equalization. How DOCSIS pre-equalization works and how DOCSIS pre-equalization can be extended. In the greater context of the paper, the reader must consider the implications of the extensions of DOCSIS pre-equalization. In section 5, details will be provided on how DOCSIS pre-equalization can be used to identify plant impairments and locate those impairments to within a few feet. This turns every

8 10, 2013

DOCSIS codeword errors – NCTC member exclusive Webinar

2013-10-08T16:56:19-04:00October 8th, 2013|

Join us on Thursday, October 10 at 3pm central time for this MUST SEE Webinar on Codeword Errors Codeword Errors - What are they? Why do you care?  DOCSIS codeword errors is terminology that you may or may not be familiar with. But no matter which camp you're in it is important to know that monitoring codeword errors will enable you to improve your subscriber's quality of experience. DOCSIS codeword errors are the deciding factor if you have an RF impairment or if you do not have an RF impairment.

3 10, 2013

DOCSIS PNM DEMO SCTE EXPO 2013 CableLabs Booth #1969

2020-04-04T09:20:40-04:00October 3rd, 2013|

DOCSIS PNM DEMO SCTE EXPO 2013 - CableLabs Booth #1969 Come See a DEMO of the exciting DOCSIS PNM Technology at this years SCTE Cable Tech Expo in the CableLabs Booth #1969.  Brady Volpe will be giving demonstrations. To find out more about PNM you can also attend one of two PNM presentations or watch a brief tutorial overview. "By using PNM as network probes, cable operators can collect device and network parameters. Combining the analysis of the data along with network topology and device location, it is

12 09, 2013

DOCSIS 3.1: Begin Preparing Now

2013-09-12T14:45:51-04:00September 12th, 2013|

DOCSIS 3.1: Begin Preparing Now Posted on September 11, 2013 by Carl Weinschenk-BTR Experts believe that DOCSIS 3.1 is few years off. The specification has not yet been finalized. After that, test and early customer premise equipment (CPE) and corresponding CMTS and CCAP line cards will be sprinkled through systems. The bottom line is that it will be a long time until DOCSIS 3.1 is an element of everyday cable operations. So preparations should start now. The industry has been down this road before. What seems like a long road, with

22 08, 2013

Troubleshooting Cable Networks

2020-04-02T09:57:28-04:00August 22nd, 2013|

CED Presents an Educational Webcast Troubleshooting Cable Networks - Understanding Ingress Impairments Brady Volpe will be a panelist on: "The two-way nature of cable networks is being increasingly exploited for innovative new features and services, including interactive TV applications, video conferencing, data back up, and wireless backhaul (all in addition to high speed data, VoIP, and Internet TV). Growing reliance on the return path highlights the very common problem of upstream cable ingress interferences. MSO's are planning the deployment of DOCSIS 3.1 technology to offer greater downstream/ upstream

21 08, 2013

DOCSIS PNM – Something Really Interesting!

2021-08-18T09:15:32-04:00August 21st, 2013|

DOCSIS PNM - Get Excited! Awhile back I wrote an article about DOCSIS Proactive Network Maintenance (PNM).  Not only did I find this technology fascinating I decided to really get involved with PNM.  I will also be speaking at SCTE EXPO on the topic of PNM this year.  Topic: DOCSIS Pre-Equalization: Vastly Powerful, Often Undervalued For those of you who have not heard of PNM, here are the highlights.  DOCSIS Proactive Network Maintenance (PNM) developed by InGeNeOs™ under Cablelabs®.   It is one of the coolest technologies I've been involved

2 07, 2013

DOCSIS & Testing Best Practices in an All Digital Network

2021-11-24T10:51:51-05:00July 2nd, 2013|

DOCSIS & Testing Best Practices in an All Digital Network ANGACOM - 2013 Missed ANGACOM 2013?  Don't worry, you can still see the presentation on DOCSIS & Testing Best Practices in an All Digital Network along with the speaker notes for each slide.  This was only a 15 minute presentation, so time was limited on the depth of material that could be covered in the time given. Slide 2 – Overview What do I mean by all digital networks and why is the cable industry moving in this

30 05, 2013

Brady Volpe Presenting at ANGACOM June 4th – June 6th

2013-05-30T10:16:19-04:00May 30th, 2013|

Come See Brady Volpe present at ANGACOM 2013 Topics: You can also see Brady present on - DOCSIS & Testing Best Practice in an All Digital Plant - Tuesday, June 4, 2013, 12.00 to 1.15 p.m. Pre-equalization analysis (PNM) and the benefits this analysis has for cable operators is the topic Brady Volpe will present on at ANGACOM.de in Cologne Germany next week at the - ANGACOM International Breakfast by SCTE , June 5th, 2013.  It will include the activity surrounding the CableLabs initiative on PNM. Additionally Brady Volpe will be in Halle 10.2  (upstairs)

18 10, 2012
  • DOCSIS T3 and T4 timeouts

DOCSIS 3.0 Cable Modem Registration, T3 & T4 Timeouts

2012-10-18T08:00:46-04:00October 18th, 2012|

Several of you have have contacted us because you missed us at our first two speaking engagements and didn't get a poster. The good news is we are still here till Friday and have one speaking engagement left. The poster is 23 x 35 inches.  That's approximately two feet by three feet.  It's a nice size to hang up in your headend or in your office.  Come see us our last EXPO presentations on Friday, October 19, 1:00–2:15 pm we will be happy to give you a poster after the presentation.  We

Go to Top